The clear span was 4.78 m and the loading points were 0.5 m
apart, as shown in Fig. 5. The loading points and supports were
made using rolling blocks, and one sphere blockhead was used to
transfer the load from the hydraulic jack to the spreader beam.
The test setup is shown in Fig. 6.