若設備的重複性是指設備上的

若設備的重複性是指設備上的"量測儀器"且作為"品質管制判定",此設備請

若設備的重複性是指設備上的"量測儀器"且作為"品質管制判定",此設備請購部門需提出需求並與QC討論方法及樣品準備並分配工作,正常狀況,在設備採購規格就會定義SAT的要求內容生產線的量儀操作,還是需要請設備保管人,操作執行較為洽當若不是設備上的"量測儀器",應由生產設備請購部門會同製程或生產技術部門確認
0/5000
原始語言: -
目標語言: -
結果 (英文) 1: [復制]
復制成功!
If the repeatability of the equipment refers to the "measuring instrument" on the equipment and is used as a "quality control judgment", the equipment purchasing department needs to make a request and discuss the method and sample preparation with QC and assign work. Normal conditions, in the equipment purchasing specifications It will define the requirements of SAT for the operation of measuring instruments on the production line. Or do you need to hire an equipment custodian? If the operation is not a "measuring instrument" on the equipment, it should be done by the production equipment purchasing department in conjunction with the process or production technology department. confirm
正在翻譯中..
結果 (英文) 2:[復制]
復制成功!
If the repeatability of the equipment refers to the "measuring instrument" on the equipment and serves as a "quality control judgment",<br>The equipment procurement department needs to propose requirements and discuss methods and sample preparation with QC, and allocate work,<br>Under normal circumstances, the SAT requirements will be defined in the equipment procurement specifications<br>The operation of the measuring instrument on the production line still needs to be handled by the equipment custodian, and the operation is carried out in a coordinated manner<br>If it is not a "measuring instrument" on the equipment, it should be confirmed by the production equipment procurement department in conjunction with the process or production technology department
正在翻譯中..
結果 (英文) 3:[復制]
復制成功!
If the repeatability of the equipment refers to the "measuring instrument" on the equipment and is regarded as the "quality control judgment",<br> The requisition department of this equipment needs to put forward the demand and discuss the method, sample preparation and distribution with QC.<br> Under normal conditions, the requirements of SAT will be defined in the equipment procurement specification.<br> <br> For the gauge operation of the production line, it is still necessary to ask the equipment keeper, and the operation is more appropriate.<br> <br> If it is not a "measuring instrument" on the equipment, it should be confirmed by the production equipment requisition department in conjunction with the process or production technology department.
正在翻譯中..
 
其它語言
本翻譯工具支援: 世界語, 中文, 丹麥文, 亞塞拜然文, 亞美尼亞文, 伊博文, 俄文, 保加利亞文, 信德文, 偵測語言, 優魯巴文, 克林貢語, 克羅埃西亞文, 冰島文, 加泰羅尼亞文, 加里西亞文, 匈牙利文, 南非柯薩文, 南非祖魯文, 卡納達文, 印尼巽他文, 印尼文, 印度古哈拉地文, 印度文, 吉爾吉斯文, 哈薩克文, 喬治亞文, 土庫曼文, 土耳其文, 塔吉克文, 塞爾維亞文, 夏威夷文, 奇切瓦文, 威爾斯文, 孟加拉文, 宿霧文, 寮文, 尼泊爾文, 巴斯克文, 布爾文, 希伯來文, 希臘文, 帕施圖文, 庫德文, 弗利然文, 德文, 意第緒文, 愛沙尼亞文, 愛爾蘭文, 拉丁文, 拉脫維亞文, 挪威文, 捷克文, 斯洛伐克文, 斯洛維尼亞文, 斯瓦希里文, 旁遮普文, 日文, 歐利亞文 (奧里雅文), 毛利文, 法文, 波士尼亞文, 波斯文, 波蘭文, 泰文, 泰盧固文, 泰米爾文, 海地克里奧文, 烏克蘭文, 烏爾都文, 烏茲別克文, 爪哇文, 瑞典文, 瑟索托文, 白俄羅斯文, 盧安達文, 盧森堡文, 科西嘉文, 立陶宛文, 索馬里文, 紹納文, 維吾爾文, 緬甸文, 繁體中文, 羅馬尼亞文, 義大利文, 芬蘭文, 苗文, 英文, 荷蘭文, 菲律賓文, 葡萄牙文, 蒙古文, 薩摩亞文, 蘇格蘭的蓋爾文, 西班牙文, 豪沙文, 越南文, 錫蘭文, 阿姆哈拉文, 阿拉伯文, 阿爾巴尼亞文, 韃靼文, 韓文, 馬來文, 馬其頓文, 馬拉加斯文, 馬拉地文, 馬拉雅拉姆文, 馬耳他文, 高棉文, 等語言的翻譯.

Copyright ©2024 I Love Translation. All reserved.

E-mail: